LNG TERMINAL STRUCTURES (ONGOING)

 

LNG TERMINAL STRUCTURES (ONGOING)

ARCTIC LNG2 Project – GBS1, GBS2

and GBS3 Utility Rack and LNG Skid Modules

Development of workshop drawings; supply of steel, paint and insulation materials; fabrication and delivery of 180 modules containing, 6200t of steel structure, 139.000 dia-inch of piping,

131.000 m² of painting (mainly PFP and CSP) and 33.400m of electric cable way works in total.